The Stakeholder Formula

Select the optimal strategy for managing stakeholders effectively.

  • Stakeholder Management
  • Prioritization
  • Engagement Strategy

In short

The Stakeholder Formula sets how much effort to put into each stakeholder. Rate threat, opportunity, stake and motivation from 0 to 10, then compute Engagement = (6 × threat + 3 × opportunity + stake) × motivation. The 0–1,000 score maps to one of six strategies, from No Engagement through Monitoring, Informing, Consulting and Collaboration to One Team.

For: Project managers, product owners and Agile teams

The Problem

Balancing stakeholder engagement is critical in Agile,1 yet too much or too little can lead to costly mistakes, slowdowns, or wasted effort. The challenge is involving stakeholders just enough—ensuring value without unnecessary friction or dependencies. Agile development requires a balance between flexibility and structure in stakeholder engagement, where under- or over-involvement can disrupt team dynamics.2

The Experiment

Collaborating with project managers and product owners, I refined the Stakeholder Formula—an approach that adapts traditional models like the Power-Interest Matrix3 and the Salience Model4 to real-world Agile environments. By structuring engagement levels based on value contribution, teams found a practical way to maximize stakeholder involvement without excess overhead. Agile methodologies emphasize continuous feedback loops between teams and stakeholders, making structured engagement crucial.5

What Are Effective Ways to Engage with Stakeholders?

In stakeholder management, various strategies are available, each differing in terms of effort, time commitment, and desired outcomes.6 As part of the Stakeholder Formula, here are the strategies listed in descending order of effort required:

1. No Engagement

A man with his eyes closed and a blank expression, plugging both ears with his fingers.

This strategy involves completely ignoring the stakeholder and allocating no time or effort toward their management. It’s as if they don’t exist in our stakeholder landscape.

2. Monitoring

A man looking straight ahead through a pair of binoculars held in both hands.

With this strategy, we periodically observe and track the stakeholder’s activities without actively engaging in information exchange or interaction. The aim is to assess the situation and determine if a shift to a more engaged strategy becomes necessary.

3. Informing

A single speech bubble with three lines of text in it: one-way communication.

Here, we engage in one-way communication with the stakeholder, providing them with regular updates and relevant information. Our goal is to keep them informed without seeking specific actions from their end.

4. Consulting

Two speech bubbles facing each other, each with lines of text: two-way communication.

In this strategy, we establish a two-way communication channel, primarily seeking input from the stakeholder. By asking questions, we aim to understand their expectations, needs, and challenges. This helps us assess how well our initiatives align with their expectations.

5. Collaboration

An open hand reaching toward a yellow puzzle piece held by another hand.

With this strategy, the stakeholder actively participates in identifying and implementing mutually satisfactory solutions. We work closely together, recognizing that the stakeholder may have different goals from our own.

6. One Team

Two hands each holding a yellow puzzle piece, bringing the two pieces together so they fit.

Collaboration evolves into the “one team” strategy when we and the stakeholder share a common goal and work together as equal partners toward its achievement. Our efforts are aligned, and we function as a unified entity.7

0. Motivation

A yellow horseshoe magnet with two lightning bolts beside it, signalling attraction.

Additionally, it’s important to note that there is one meta-strategy, “Motivation,” which encompasses actions required to implement the consulting, collaboration, and one-team strategies. Its purpose is to generate stakeholder interest and willingness to engage with us effectively.8

How to Select Our Engagement Strategy?

When applying the Stakeholder Formula, it is important to consider four key characteristics of stakeholders that guide the selection of an appropriate strategy:10

1. Threat

A yellow skull.

This characteristic assesses the likelihood of a stakeholder having a significant negative impact on the successful achievement of our goals.11 This is critical for risk mitigation, especially in high-stakes projects.12

2. Opportunity

A smiling yellow sun with rays around it.

The likelihood of a stakeholder having a significant positive impact.13 Strategic collaboration can enhance project outcomes and competitive advantage.14

3. Stake

A yellow die tilted mid-roll.

This characteristic acknowledges the stakeholder’s vested interest, whether positive or negative, in the context of our goal’s implementation or non-implementation.15 It highlights the relevance of their involvement and the potential impact on their own interests.

4. Motivation

A yellow horseshoe magnet pointing up, with two lightning bolts above its poles.

Motivation gauges the stakeholder’s desire and willingness to actively engage and interact with us. Understanding their level of motivation helps determine the extent to which we can establish effective communication, collaboration, and shared decision-making.

What Is the Stakeholder Formula?

The Stakeholder Formula assigns the highest importance to the threat, moderate importance to the opportunity, and the least importance to the stake. Motivation acts as a multiplier in this equation. Hence, even if the assessment of the first three stakeholder characteristics is favorable, if the stakeholder lacks motivation, the initial focus should be on increasing motivation before implementing strategies like consulting, collaboration, and one team. The formula can be represented as follows:

Engagement = (6 x threat + 3 x opportunity + stake) x motivation

To calculate the engagement score, each characteristic is evaluated on a scale of 0 (lowest) to 10 (highest). The resulting engagement score ranges from 0 to 1,000. A higher score indicates a greater need for active stakeholder management. The table below outlines the recommended management strategies based on the engagement score:

Engagement ScoreManagement Strategy
Engagement < 100No Engagement
100 < Engagement < 200Monitoring
200 < Engagement < 300Informing
300 < Engagement < 400Consulting
400 < Engagement < 500Collaboration
500 < EngagementOne Team

The color-coded table highlights the investment required to effectively manage each stakeholder. As more stakeholders fall within the darker gray zones, greater time and effort are needed to engage and address their needs.

References

  1. M. Paasivaara, C. Lassenius, V. Heikkilä, K. Dikert, and C. Engblom, “Exploring Agile Transformation: A Case Study,” Empirical Software Engineering 23, no. 5 (2018): 2550–96.
  2. B. Boehm and R. Turner, Balancing Agility and Discipline: A Ghuide for the Perplexed (Addison-Wesley Professional, 2004).
  3. A. Mendelow, “Environmental Scanning: The Impact of the Stakeholder Concept,” International Conference on Information Systems 1981 Proceedings 20 (1981), https://aisel.aisnet.org/icis1981/20.
  4. R. K. Mitchell, B. R. Agle, and D. J. Wood, “Toward a Theory of Stakeholder Identification and Salience: Defining the Principle of Who and What Really Counts,” Academy of Management Review 22, no. 4 (1997): 853–86.
  5. H. Sharp, H. Robinson, and M. Petre, “The Role of Physical Artefacts in Agile Software Development: A Case Study,” Interacting with Computers 21, no. 1–2 (2009): 108–16.
  6. R. E. Freeman, Strategic Management: A Stakeholder Approach (Pitman Publishing, 1984).
  7. K. Conboy, S. Coyle, X. Wang, and M. Pikkarainen, “People over Process: Key People Challenges in Agile Development,” IEEE Software 28, no. 4 (2011): 48–57.
  8. G. T. Savage, T. W. Nix, C. J. Whitehead, and J. D. Blair, “Strategies for Assessing and Managing Organizational Stakeholders,” Academy of Management Executive 5, no. 2 (1991): 61–75.
  9. P. Eskerod and M. Huemann, "Sustainable Development and Project Stakeholder Management: What Standards Say," International Journal of Managing Projects in Business 6, no. 1 (2013): 36-50.
  10. E. Mazur and K. Pisarski, "Major Project Teams: Understanding and Improving Project Manager-Stakeholder Relationships," Engineering Project Organization Journal 5, no. 2-3 (2015): 85-99.
  11. S. Matos and B. Silvestre, "Managing Stakeholder Relations When Developing Sustainable Business Models: The Case of the Brazilian Energy Sector," Journal of Cleaner Production 45 (2013): 61-73.
  12. K., Aaltonen, and J. Kujala, “A Project Lifecycle Perspective on Stakeholder Influence Strategies in Global Projects,” Scandinavian Journal of Management 26, no. 4 (2010): 381–97.
  13. T. Donaldson and L. E. Preston, “The Stakeholder Theory of the Corporation: Concepts, Evidence, and Implications,” Academy of Management Review 20, no. 1 (1995): 65–91.
  14. T. J. Rowley, “Moving Beyond Dyadic Ties: A Network Theory of Stakeholder Influences,” Academy of Management Review 22, no. 4 (1997): 887–910.
  15. R. K. Mitchell, B. R. Agle, J. J. Chrisman, and L. J. Spence, “Toward a Theory of Stakeholder Salience in Family Firms,” Business Ethics Quarterly 21, no. 2 (2011): 235–55.

From Never Stop Experimenting by Stavros Stavru, PhD, illustrated by Iva Grueva. Published here in full on .

How to cite this technique

Stavru, S. (2025). The Stakeholder Formula. In Never Stop Experimenting: 31 Real-World Experiments for Continuous Growth in Work and Life. Morgan James Publishing. https://neverstopexperimenting.com/techniques/stakeholder-formula